Greengill Farm AD Plant, Penrith Cumbria
Construction of a 2.4MW Plant
  • 50m – 30m digester in-situ tank x 8m deep with an in-situ concrete lid
  • 48m Diameter in-situ concrete tank 8m deep
  • 10m diameter reception tank
  • Single story in-situ concrete CHP house
  • Pump house and tunnel
  • Feeder base
  • Crane hire
Client: Greengill Farm AD Plant
Date: April 16 – November 16